Design & Engineering
Architectural design, structural engineering and full permit packages — so your project reaches the building department complete the first time.
- Existing-condition measure-ups and as-built drawings
- Concept plans, floor layouts and 3D massing studies
- Structural engineering: beams, headers, footings, underpinning
Typical: 3–10 weeks to permit, depending on municipality
Design & engineering details →


