Construction Services — Greater Toronto & Adjacent Areasinfo@qimworks.ca
All projects

Additions

Custom Rear Addition

A Markham home was extended with a two-storey rear addition built around a steel moment frame, allowing a nearly glazed rear wall with no visible posts. A cantilevered deck extends the upper floor over the garden.

Location
Markham
Duration
34 weeks
Service
Additions

Scope

What the job involved

Two-storey rear addition with steel moment frame, cantilevered deck and full-height glazing.

Explore Additions

Highlights

Key details

  • Steel moment frame designed in-house with stamped connections
  • Full-height glazing and lift-and-slide door package
  • Cantilevered upper deck with thermally broken framing
  • New footings and foundation walls tied into existing structure
  • Coordinated design, engineering and construction under one contract

Planning something similar?

Send us the address and the goal — we will scope it, price it and give you a realistic schedule.