All projects
Renovations
Legal Basement Suite
A Hamilton basement was converted into a legal secondary suite, permitted and inspected end to end. Egress, fire separation and independent mechanicals were built to Ontario Building Code so the unit could be rented with confidence.
- Location
- Hamilton
- Duration
- 13 weeks
- Service
- Renovations
Scope
What the job involved
Secondary suite build to code: egress windows, fire separation, separate HVAC and final municipal sign-off.
Explore RenovationsHighlights
Key details
- Secondary suite permit drawings and application
- Enlarged egress windows with engineered lintels
- Rated fire separation and interconnected alarms
- Separate HVAC system and dedicated electrical panel
- Final municipal sign-off and closeout documentation
Planning something similar?
Send us the address and the goal — we will scope it, price it and give you a realistic schedule.