A Richmond Hill property exceeded zoning coverage for the addition the owners wanted. We produced the as-built survey, architectural and structural sets, then prepared and presented a minor variance application that was approved without conditions.
- Location
- Richmond Hill
- Duration
- 14 weeks to permit
- Service
- Design & Engineering
Scope
What the job involved
As-built survey, architectural set, structural design and a successful Committee of Adjustment application.
Explore Design & EngineeringHighlights
Key details
- Laser as-built survey and existing-condition drawings
- Zoning analysis covering setbacks, coverage and height
- Engineer-stamped structural drawings with load calculations
- Committee of Adjustment package, rationale and hearing attendance
- Examiner comments answered and permit issued on first resubmittal