Permit Package & Variance

A Richmond Hill property exceeded zoning coverage for the addition the owners wanted. We produced the as-built survey, architectural and structural sets, then prepared and presented a minor variance application that was approved without conditions.

Location
Richmond Hill
Duration
14 weeks to permit
Service
Design & Engineering

Scope

What the job involved

As-built survey, architectural set, structural design and a successful Committee of Adjustment application.

Explore Design & Engineering

Highlights

Key details

  • Laser as-built survey and existing-condition drawings
  • Zoning analysis covering setbacks, coverage and height
  • Engineer-stamped structural drawings with load calculations
  • Committee of Adjustment package, rationale and hearing attendance
  • Examiner comments answered and permit issued on first resubmittal